San Bernardino County

Flexible Pavement Treatment

  • Preventive Treatment: Slurry Cape PG76-22TR
  • Project Description: City of Fontana Residential Feeder Street Polymer Modified Hot Asphalt Tire Rubber Chip Seal and Polymer Modified Emulsion Slurry Seal
  • Is it an Innovation Project? No
  • District: 8
  • EA Number: City of Fontana
  • Project Status: Completed
  • Postmile Start: Asst Streets
  • Postmile End: Asst Streets
  • Country: USA
  • Province:
  • State: California
  • City: Fontana
  • County: San Bernardino County
  • Functional Class: Collector roads
  • Route Name/Number: Assorted Collectors
  • Length of the Project: 300,000 sq yards
  • Total Number of Lanes:2
  • Two way or One way Street: 2 Way
  • Start Construction Date: 08-06-2009
  • End Construction Date: 08-17-2009
  • Project Input Date: 02-04 00:00:00-2010
  •  Starting Point Elevation: 300
  • Ending Point Elevation: 300
  • Project Locations: Road - 1 Road - 2
  • Estimated Treatment Life 12 years
  • Treatment Life:
  • Design Traffic Volumes: adt<5000<30,000
  • Traffic Volumes Others:
  • Climate Desert: No
  • Climate Valley: Yes
  • Climate Coastal: No
  • Climate Mountains: No
  • Night: No
  • Cold: No
  • Stop Points: Yes
  • High Snow Plow Use: No
  • Urban: Yes
  • Rural:
  • Total Cost of Project: 1.8 mil
  • Cost: $/SQ YD: 6.00
  •  Innovation ID: 0